Orleans Conservation Commission
Work Meeting Nauset Room August 26, 2014
8:30 a.m. Call to Order
Continuations
Last Heard 8/5/14 (JO1)
Thomas & Teresa Healy 36 Arey’s Lane
by East Cape Engineering, Inc. Assessor’s Map 62, Parcel 48. The proposed removal of an existing garage & driveway, construction of a new garage, driveway, deck, pool, pool house, & perform vegetation improvements. Work will occur within 100’ of the Edge of Wetland & Coastal Bank, & on a Coastal Bank, in Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Certificate of Compliance
James & Colleen Young (2005) 10 Towhee Lane
The request for a Certificate of Compliance for an Order of Conditions for the construction of additions to an existing dwelling.
Administrative Review
Sarah Fisher 29 Henson’s Way
The proposed removal of dead locust snags and bittersweet vines. Work to be done by applicant.
Rebecca & Douglas Fellows 62 Captain Linnell Road
The proposed removal of 8-10 dead trees threatening house. Work to be done by Azinger Landscape.
Phillip Mullen 148 Beach Road/5 High Street
The proposed relocation of 3 cedar trees. Work to be done by HF Johnson Tree.
Phil Benton 34 Twinings Lane
The proposed reduction of all oak species in rear to 2-3’. Work to be done by Bartlett Tree Experts.
Kate Sullivan 73 Barley Neck Road
The proposed removal of 4 black locusts. Work to be done by Bartlett Tree Experts.
Jen Burton 13 Quail Hill Road
The proposed removal of 5 trees. Work to be done by Jimmy Reynolds.
Jen Burton 13 Quail Hill Road
The proposed replacement of an existing deck. Work to be done by Brendan Parker.
Chairman’s Business
Approval of the Minutes from the Meeting on April 1 & August 12, 2014
Correspondence
Orleans Charter Review Committee
Other Member’s Business
Request to Expend up to $400 from the Wetland Filing Fees account for Commissioner Training
Administrator’s Business
Site Visits
Julie Guibord 12 High Street
by JC Ellis Design Co., Inc. Assessor’s Map 29, Parcel 14. The proposed upgrading of the existing septic system. Work will occur within 100’ of the Edge of a Bordering Vegetated Wetland & a Ditch.
Gerald T. & Caroline C. Mulligan 16 Ewing Drive
by Coastal Engineering Company, Inc. Assessor’s Map 93, Parcel 17. The proposed construction of a steel sheetpile wall & replacement of an existing clay pipe with a high density polypropylene pipe. Work to occur on a within 100’ of a Coastal Beach & Salt Marsh, & on a Coastal Bank, within Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Tamara Fouche-Gamache 77 Towhee Lane
by Ryder & Wilcox, Inc. Assessor’s Map 93, Parcel 4. The proposed construction of a patio & the replacement of an existing timber stairway has been Amended to replace the remaining walkway & stairs that connect to the existing boathouse. Work will occur within 100’ of the Top of a Coastal Bank, on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.